The clippings off all 18 greens
That's us finished edging and reshaping sand in all bunkers 88 in total
Other jobs this week were to rake bunkers 3 times Mon, Wed and Fri, move tee markers, empty tee bins, shut down all hose point valves and prime up irrigation system as we have been out hand watering the new turf to stop it drying out it looks like we have only got 1 sprinkler head sticking and no leaks yet fingers crossed, changed holes, stimped greens which they are running at 9', looked at core samples from the greens for root depth, thatch and moister, Verti-drained all par 3 fairways and fairways 2, 3, 4 and divoted tees we are trying out Bar Fairway seed in our divot mix as it Germinates in lower temperatures and this will be the seed used for over seeding the tees this year
No comments:
Post a Comment