Tuesday, 9 March 2010

Here's Andy slit tining fairways, he managed to complete fairways 7 to 16 today
1st green after being sprayed with liquid iron

We dug down to the drain on the 5th surround to find out why we get flooding and we found out that heavy clay was put back on top of the pipe and gravel so this was taken away and replaced with sandy soil hopefully this will allow the rain water to drain away quicker and if so we will repeat this for the full length of the drainage line

We replaced the old worn tines on the verti-drainer this morning before verti-draining all walkways again. Other jobs this week so far have been to rake bunkers, roll greens, spray surrounds and tees with liquid iron and finish off coring the tees which I'm hoping to start scarifying, seeding and topdressing next week