Thursday 13 October 2016

 The guys busy getting the greens cut & turf ironed to help smooth the surface after the aeration work, bunkers being raked and fairways/tees divoted
 More deep hollow coring on the Putting green to help replace the heavy soil with sand to improve the drainage etc
 After the roughs have been cut, we are raking into the sward 2 ways to help reduce the thickness of the roughs
 The bench at the walkway up to the Clubhouse from the Balcomie course has been replaced and the surrounding areas tidied up
Just 2 weeks since the aeration work to the greens and they are recovering well

No comments:

Post a Comment