Friday 22 January 2010

More rain

We had 19mm of rain through the night which meant loads of flooding, so we closed the front 9 so jobs today were rake all bunkers, move tee markers, brush winter mats, re-turf the worn area at the 16th greenside bunker, clean out winter hole cups, carry on raising sprinkler heads on greens 15 & 17 and we cored the 7th tee walkway and gave it a heavy top-dressing of sand, jobs that we had planned to do before the rain stop them were roll greens & cut aprons.

No comments:

Post a Comment