
All tees were cut & divoted for the first time in 6 weeks

We raised all 5 sprinkler heads on green 14 and replaced the heavy soil with sandy soil

The wall in front of the 12th tees is now finished and looks at lot tidier

We cored the 3rd tee walkway, I'm hoping this will help to keep the surface drier, we will repeat this through out the summer

As you can see the soil has large amounts of clay in it



The area was given a heavy top-dress with sand then left to dry then was brushed in, I'm hoping to try and introduce sand to the heavy clay profile over time
No comments:
Post a Comment