Today we were still working away at the drainage project at hole 18 on the Balcomie course, the mini hopper has been a godsend for back filling the trenches with the pea gravel it's at least 50% quicker and less labour to back fill than by hand, hopefully by the middle of next week this job will be completed weather permitting
Balcomie course- all bunkers raked, tee markers moved and divoted, greens cut and turf ironed, balls collected off driving range, more edging/cleaning up of path from 18th to car park and made a start again to slit tining fairways after break
Craighead course- greens rolled, tee markers moved and divoted, bunkers raked, 11th fairway divoted and starter hut area edged and tidied up
Friday, 16 November 2012
Thursday, 15 November 2012
Monday, 12 November 2012
A touch of frost first thing, Today was the start of the Balcomie course being closed for winter work & drainage so we started the drainage work at hole 18, rebuilding the 1st greenside bunker, started divoting fairways and spraying greens and surrounds with iron. The Craighead course we brushed greens to disperse the dew once the frost had lifted and raked bunkers and moved tee markers
The gravel banding is across and above a drain that we put in 6 years ago which should help drain water off the surface quicker and into the existing drain
The gravel banding is across and above a drain that we put in 6 years ago which should help drain water off the surface quicker and into the existing drain
Saturday, 10 November 2012
Wednesday, 7 November 2012
This week the Craighead course is closed for winter work again so we have been rebuilding the 17th right greenside bunker
Aeration work has been slit tining greens and verti-draining tees this will really help to relieve compaction and allow air and water movement into and through the soil profiles
Other jobs have been brushing sand into the drainage lines, trimming tee sprinklers and fairway yardage discs, spraying greens and surrounds with liquid iron and edging grass areas at the entrance to Clubhouse and Car park areas. On the Balcomie course we have just been rolling greens and raking bunker and moving tee markers daily
Aeration work has been slit tining greens and verti-draining tees this will really help to relieve compaction and allow air and water movement into and through the soil profiles
Other jobs have been brushing sand into the drainage lines, trimming tee sprinklers and fairway yardage discs, spraying greens and surrounds with liquid iron and edging grass areas at the entrance to Clubhouse and Car park areas. On the Balcomie course we have just been rolling greens and raking bunker and moving tee markers daily
Friday, 2 November 2012
Today we were catching up with cutting and tidying up both courses as we have been concentrating on our drainage work this week, the Balcomie greens we turf ironed and rolled to help smooth off the surface as still a bit bumpy from the aeration work
The drainage job at hole 1 is completed after we had to repair the irrigation pipe as we hit it with the trencher lol
The drainage job at hole 1 is completed after we had to repair the irrigation pipe as we hit it with the trencher lol
Thursday, 1 November 2012
Another small drainage and repair job in front of our 1st green on the Craighead course which we drained into the greenside bunker and the low area was raised to make it easier to cut etc
Drainage at the 4th fairway continues with back filling the trenches with pea gravel to 1" from the top then sand on the surface
Winter par 3 tee mats completed and in play now
The 9th greenside bunker rebuilt the first of many this winter
Drainage at the 4th fairway continues with back filling the trenches with pea gravel to 1" from the top then sand on the surface
Winter par 3 tee mats completed and in play now
The 9th greenside bunker rebuilt the first of many this winter