Friday, 2 November 2012

 Today we were catching up with cutting and tidying up both courses as we have been concentrating on our drainage work this week, the Balcomie greens we turf ironed and rolled to help smooth off the surface as still a bit bumpy from the aeration work
 The drainage job at hole 1 is completed after we had to repair the irrigation pipe as we hit it with the trencher lol

No comments:

Post a Comment