With being back in lock-down we have reduced the staffing levels for safety
All the greens were rolled after to help smooth off the surfaces and the greens that were solid tined were double rolled
Work is ongoing at the new pump-house/tank surrounding area
We have added a bank to help the tank fit in better with the surrounding areas and we utilised all the old turf from this area for the banking
Adverse weather jobs have been to fully drain and clean out our recycling wash pad
And building another Railway sleeper recycling bin for the Balcomie course
No comments:
Post a Comment