We have been out spraying the Craighead course fairways with soluble iron to help reduce the moss
Last week we carried out cutting to most areas over both the courses as it was dry enough after the wet February
The Craighead course greens were deep spiked to help drainage and allow better air movement through the profile
minimum disturbance to the surfaces after the greens were rolled
The 7th tee project on the Balcomie course is ready for the surfaces to be turfed
surfaces all re-leveled
Railway sleeper work completed on the tee side, ready for the bench and new recycling bin
the tee surface starting to be re-turfed, this will be completed by the end of this week weather pending
the other side of the path will have a row of Railway sleepers along it to finish this edge off
Absolutely devastated to report that we have had vandalism to our 11th green on the Craighead course from a man on a motorbike
work is ongoing to try and fix the surface best we can by forking up, spiking, over seeding and top-dressing the damaged areas
These areas will take up to 2/3 months to fully recover
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment