Friday, 8 February 2019

 The big thaw at last
We have been working away at the 15th tee path on the Balcomie course, digging in and cementing in our strainer posts for bolting the railway sleeper wall to round the tee side of the path


 These will now be left to allow to set before carrying on with this project
 After the frost came out the ground we got all our green hand cut to help tidy up the surfaces and a roll, holes changed and bunkers raked

Our next winter project is to re-level the 16th tee on the Balcomie course, all the old turf was reused on other winter projects so not to waste any materials

All the work at the 13th path on the Balcomie course has now been completed

 Adverse weather jobs have been to continue to paint tee posts and markers, having completed all the painting/repairs to all the tee benches

1 comment:


  1. I was wondering if you ever considered changing the layout of your blog? Its very well written; I love what youve got to say. But maybe you could a little more in the way of content so people could connect with it better. Youve got an awful lot of text for only having one or two images. Maybe you could space it out better?
    function rooms cabramatta

    ReplyDelete