Some moody sky's this week
We have rebuilt the 17th greenside bunker on the Craighead course
we are continuing to seed and divot the old drainage lines from last year to smooth off the surfaces at hole 2 on the Craighead course
That's us using winter tee mats at our par 3 tees over both courses to allow the surfaces to recover for next years season, the tee markers will be off turf for winter competitions
Par 3 tees on both courses were fully divoted then a heavy sand top-dressing to fill in any old divots and smooth off the surfaces
All Craighead course greens, surrounds, tees & fairways have been sprayed with iron to help harden up the plant going into the winter
The Ladies 18th tee on the Craighead course has been re-leveled, we also have managed to re-use the existing turf to save wasting materials
The tee will be out of play till the start of next season to allow to establish
Subscribe to:
Post Comments (Atom)
نور الحرمين
ReplyDeleteشركة تنظيف منازل بالاحساء
شركة تنظيف مجالس بالاحساء
شركة تنظيف مساجد بالاحساء