This week we have been carrying out tests on our old Balcomie course irrigation system to check pressure at certain points
We have also installed 2 new water meters at our tanks to measure our water from both the bore holes
in-between the wet weather this week we manged to paint our storm huts on the Balcomie course
And paint our mess room, toilets and hall floors
The next section of dyke to be rebuilt on the Craighead course at hole 15 was cut down ready, so hopefully this will be started in November. Another jobs this week were to cut most of the playing areas, an Autumn fertiliser was applied to the Balcomie course tees and catching up on fairway divoting too