The car parks getting gritted to help keep these areas safer because of the frosty mornings
A start was made to cutting/trimming gorse back with having frost this morning
9th green side bunker completed on the Craighead course
At last managed to break through all the rock, the big clean up starts
The water pipe and drainage works still on going, hopefully 2 to 3 days work left to complete weather pending
Checking the face angle on our newly built bunkers
Repairs to the roundabout as a lorries wheels had damaged the edge and turf
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment