Tuesday, 12 February 2013

 Next week we are planning to place all the rock and stone which was driven down from a local farm to help reduce the erosion behind the 17th green on the Balcomie course but first we need to take away the existing bank and store so we can reuse the soil to re-instate the bank. We dug a soak away on the low part of the 16th fairway to help reduce standing water on the surface and hopefully reduce turf damage

Other jobs - On the Craighead course we have been verti-draining tees and topping up bunkers with sand on the front 9 holes, we did try to make a start back to the drainage on hole 8 but still too wet

No comments:

Post a Comment