We have started drainage work on the Craighead course 4th fairway
We are gravel banding above the drains we installed last year at 1.5metre spacing to help improve surface drainage this will be ongoing for the next 2 months weather permitting
The trenches are getting back filled with pea gravel the soil from the trenches is getting reused to extend the mound at the 6th tees
As we have very little growth we just turf ironed the greens today to disperse the dew then sprayed a preventative fungicide as this is the usual time for disease attack going into the winter months we will hopefully spray the Balcomie greens tomorrow as well
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment