With the frosty mornings we have been carrying out jobs away from playing surfaces which have been draining down the irrigation system and the toilet block on the course, painting tee pots then when the frost has lifted we have made a start to cutting and collecting the deep roughs, extending the 15th medal tee and working at the 15th bunker rebuild
Hopefully with taking away the clippings from the roughs will help to starve these areas to produce a slightly thinner rough and reduce the rougher grasses
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment