Saturday 31 August 2019

 We have sprayed a liquid fert & iron on the Craighead greens to give the plant some more nutrients
 As it's coming to the end of the season and the nesting birds will be away from the nests we have started to cut & collect our deep roughs on the Craighead course, this should help to thin these areas out and make them more playable next year, the roughs have been thicker this year due to the rain fall we have had this Summer
 Still at full cutting of all playing surfaces over both courses


 This week we started our aeration plans to the Craighead course tees, which consists of double scarifying at 8mm, double verti-cutting, tidying up then cutting, this is to reduce thatch levels on the surfaces



 Our new shed extension has started at our main Green-keeping shed, this is to allow us to demolish our existing shed and old irrigation tanks on the driving range which will let us put the new irrigation tank & pump-house closer to the bank to help hide these plus redevelop the driving range in the future
 removal of the spoil to make way for the foundations
 hardcore being laid under the flooring
 foundations being dug for the steelworks
 Concrete poured and left to set before the steelworks come on site