Thursday 3 November 2016

 That's the foundations poured for the toilets
 The Green staff are digging a 350metre at 1metre deep trench to supply the new toilet with mains water and at the same time lay a new 4" irrigation mains pipe onto the Balcomie course

 It's the second mid week winter closure on the Craighead course, so we have sprayed greens, surrounds, tees & fairways with soluble iron, plus we had to spray the greens with a fungicide as we had an attack of fusarium
 with the course closed, we took the chance to carry out small repairs to sprinkler heads etc
 We have a demo of the Rotoknife aerator to try on fairways and areas above drainage lines etc, these discs cut into the turf to a depth of 125mm helping relieve compaction and improving drainage
 minimal disturbance from the discs to the playing surface
 John building the new 5th bunker face
 5th bunker completed
4th bunker completed

No comments:

Post a Comment