Friday 12 December 2014

 The car parks getting gritted to help keep these areas safer because of the frosty mornings
 A start was made to cutting/trimming gorse back with having frost this morning
 9th green side bunker completed on the Craighead course

 At last managed to break through all the rock, the big clean up starts
 The water pipe and drainage works still on going, hopefully 2 to 3 days work left to complete weather pending
 Checking the face angle on our newly built bunkers
Repairs to the roundabout as a lorries wheels had damaged the edge and turf

No comments:

Post a Comment