Thursday 10 January 2013

Happy New Year to you all, sorry no photo's problem with the blog site

Balcomie course - This week we have been cutting or rolling greens daily with the mild/damp weather, raking bunkers and moving tee markers daily too other jobs were to cut the surrounds, finish off spraying fairways with iron, divoting tees, digging out drain outfalls as they were blocked from the high tides at hole 5 and verti-draining walkways

Craighead course - This week this course is closed for rest and for winter projects, so we have been rebuilding the 16th greenside bunker, digging out the newly rebuilt bunker at the 3rd to make a much bigger soak away to help reduce flooding and making the 18th fairway bunker into 2 as this will help stop the wind blowing the sand out the bunker, other jobs have been verti-draining tees which we had to stop after the rain on Monday,cutting greens and surrounds then these areas being sprayed with iron and potassium nitrate also we have made a start to cutting the drier fairways as hairy with this mild weather

2 comments:

  1. Bob you can get pictures uploaded through the html bit of the posting page, upload the pictures you want then change back to compose to write what you want, hope this helps. keep up the good work : )

    ReplyDelete
    Replies
    1. Hi Richard thanks for the tip to get my photos back onto my Blog

      Delete