Monday 8 October 2012

 The Craighead greens were cut then sprayed with liquid iron
 Slit tining on the Balcomie fairways this will continue throughout the winter months on all fairways to relieve compaction
 This area at hole 14 on the Craighead course is where we dumped all the cores from the Balcomie greens then levelled out so it can be cut with a mower instead of being strimmed plus safer for golfers to walk over as was very uneven
 Today was the start of us carrying out drainage work which will continue on the Craighead course for the next  5 weeks, the first area is on the 18th fairway which we have drained into the bunker and the area will be all re turfed and hopefully help reduce the flooding
That's been a week since we completed the aeration work to the Balcomie course greens so we are vibrate rolling the greens each afternoon as still lifting topdressing when wet and we applied a 5.5.10 +fe fertiliser to help aid in the recovery plus give them a balanced feed for going into the winter months

No comments:

Post a Comment