Friday 14 September 2012

 What great dry weather we have been having which has allowed us to catch up on small jobs ie trimming sprinkler heads and irrigation boxes
 We have been out fertilising weak areas ie walk offs, round bunkers, weak tees and the 2nd fairway on the Craighead course
Other jobs have been to continue with resurfacing the road which we have been carrying out in afternoons after courses set ups etc, with the temperature dropping slightly we have reduced cutting on our greens and rolling or turf ironing instead and will be raising the heights of cuts in the next couple of weeks

No comments:

Post a Comment