Friday 7 January 2011

Tony back filling the drainage trench with gravel to 4" from the surface to allow us to put soil down before re-turfing
This week we have been working away at our drainage project on hole 5 and cutting gorse back on holes 16 & 17. On Wednesday the frost lifted so we managed to cut and roll greens to clean the surface up and also firm the surface and changed the holes.

No comments:

Post a Comment