Some stunning views of the courses
This week we continued with verti-cutting and cutting of greens
Once the greens were verti-cut and cut we gave them a light top-dressing of sand to help smooth the surfaces and help dilute thatch
Holes 5 & 6 on the Balcomie course
We have solid tined, verti-cut, cut, double over seeded and top-dressed the 18th green on the Balcomie course to help improve the grass species in the sward
3rd green on the Balcomie course
Greens being sprayed after being cut & rolled
The Balcomie greens being sprayed with a liquid fert at low rate
We have made a start to lightly scarifying the Balcomie course fairways to help cut out long ends and lateral growth then cut behind to help disperse the clippings
A burst hydraulic hose on our fairway mower on the 18th of the Balcomie course, luckily this is a very rare thing to happen, this area will be hand spiked, seeded and top-dressed to aid it's recovery
Friday, 16 June 2017
Friday, 9 June 2017
Challenging week with the weather
This week has just been rain and more rain with over 85mm so far, so when the weather let up we were out trying to catch up with all the cutting and repairing water damage in bunkers and on tee paths etc, on-going is cutting and collecting problem areas of deep roughs
out catching up with fairways and semi-rough cutting, we are very lucky that we dry up very quickly after heavy rain which allows us to get our large cutting machinery back out
with still having high growth we have continued to verti-cut, groom and brush at least once a week on greens etc to control lateral growth
in-between showers we had a company in called Fairways demoing the new Jacobsen truck with top-dresser and 2 greens irons
adverse weather jobs were to catch up on trimming and cleaning all sprinklers over both courses
out catching up with fairways and semi-rough cutting, we are very lucky that we dry up very quickly after heavy rain which allows us to get our large cutting machinery back out
with still having high growth we have continued to verti-cut, groom and brush at least once a week on greens etc to control lateral growth
in-between showers we had a company in called Fairways demoing the new Jacobsen truck with top-dresser and 2 greens irons
adverse weather jobs were to catch up on trimming and cleaning all sprinklers over both courses
Friday, 2 June 2017
It's all go on both the courses
we have been out using the turf iron more in the last couple of weeks with all the growth we have just now to help gain more surface pace
Both courses looking well
We have verti-cut the greens again this week to help lift the seed heads and remove thatch
the amount of clippings from the greens, 2 buggies full
the greens have had an application of wetting agent and seaweed
hole 4 on the Balcomie course
we have carried out some minor work to green 3 on the Balcomie course of solid tining, over seeding, rub in seed then a heavy top-dress to cover the seed, this is to help improve the playing surface and grass sward
Communication sign on the 3rd tee of the work being carried out to the green
It's that time of year again that we have been out cutting and collecting problem areas of deep rough to help make the courses more playable and improve these areas
We are starting to see the benefits of the rough management program as they are becoming thinner and cleaner with less rank thick grasses, but this is an ongoing program and we will tackle other areas in time
Both courses looking well
We have verti-cut the greens again this week to help lift the seed heads and remove thatch
the amount of clippings from the greens, 2 buggies full
the greens have had an application of wetting agent and seaweed
hole 4 on the Balcomie course
we have carried out some minor work to green 3 on the Balcomie course of solid tining, over seeding, rub in seed then a heavy top-dress to cover the seed, this is to help improve the playing surface and grass sward
Communication sign on the 3rd tee of the work being carried out to the green
It's that time of year again that we have been out cutting and collecting problem areas of deep rough to help make the courses more playable and improve these areas
We are starting to see the benefits of the rough management program as they are becoming thinner and cleaner with less rank thick grasses, but this is an ongoing program and we will tackle other areas in time
Friday, 26 May 2017
The weather has been really great this week and at last some heat
with the grass growing pretty hard, we have been using our brush before cutting to help stand up the grass and lift lateral growth
In the afternoons we have been working on our turf nursery, it has been rotovated, stone buried, firmed, lightly raked, seeded then lightly raked again
We all the growth, we have been out verti-cutting greens on both courses to help control the growth and thatch build up
all bunker edges and faces have been sprayed with a selective herbicide to control weeds
with the grass growing pretty hard, we have been using our brush before cutting to help stand up the grass and lift lateral growth
In the afternoons we have been working on our turf nursery, it has been rotovated, stone buried, firmed, lightly raked, seeded then lightly raked again
We all the growth, we have been out verti-cutting greens on both courses to help control the growth and thatch build up
all bunker edges and faces have been sprayed with a selective herbicide to control weeds
Thursday, 18 May 2017
After the welcomed rain on Saturday and Monday we are getting a lot of grass growth now, so we have been turf ironing behind cutting to help gain surface speed on the greens over both courses and we are now at our full cutting program
We have repainted and replaced club logo sticker on our shoe cleaner
Another irrigation leak at tee 5 on the Balcomie course
When we get a chance we have continued working at the 13th path on the Balcomie course by adding in cross drains etc to save material washing down onto the course in heavy rain
We have been getting of turf nursery ready for seeding
This week we held a TGI event on the Craighead course
We have repainted and replaced club logo sticker on our shoe cleaner
Another irrigation leak at tee 5 on the Balcomie course
When we get a chance we have continued working at the 13th path on the Balcomie course by adding in cross drains etc to save material washing down onto the course in heavy rain
We have been getting of turf nursery ready for seeding
This week we held a TGI event on the Craighead course
Friday, 12 May 2017
With the very dry weather continuing, the irrigation system has been on most nights to water greens, surrounds and tees and hand watering through the day of any other areas and high spots, so we have been trying to keep up with repairs to the older Balcomie course system
replacing ball valves for our hose points that were leaking
mains pipe to the 4th green
Replaced all pipework/valves etc in the box at green 10
mobile sprinklers out on fairways 2 & 12
We have replaced the 1st tee bin and Pro shop bin with larger sized bins to cope with the litter on very busy days
replacing ball valves for our hose points that were leaking
mains pipe to the 4th green
Replaced all pipework/valves etc in the box at green 10
mobile sprinklers out on fairways 2 & 12
We have replaced the 1st tee bin and Pro shop bin with larger sized bins to cope with the litter on very busy days
Friday, 5 May 2017
The Craighead greens are recovering well and will be back to normal in a couple of days now, we have applied another light sand dressing to help in the recovery
We have started to spray our fairways and semi-roughs with a selective herbicide to control the daises
We hired a spray contractor to help us with all the larger fairways/semi-roughs and driving range
we have nearly completed edging/weeding and topping up our tee paths, just the 15th tee path and 13th maintenance path on the Balcomie course to complete
We have started to spray our fairways and semi-roughs with a selective herbicide to control the daises
We hired a spray contractor to help us with all the larger fairways/semi-roughs and driving range
we have nearly completed edging/weeding and topping up our tee paths, just the 15th tee path and 13th maintenance path on the Balcomie course to complete
Subscribe to:
Posts (Atom)