The weather has been really great this week and at last some heat
with the grass growing pretty hard, we have been using our brush before cutting to help stand up the grass and lift lateral growth
In the afternoons we have been working on our turf nursery, it has been rotovated, stone buried, firmed, lightly raked, seeded then lightly raked again
We all the growth, we have been out verti-cutting greens on both courses to help control the growth and thatch build up
all bunker edges and faces have been sprayed with a selective herbicide to control weeds
Friday, 26 May 2017
Thursday, 18 May 2017
After the welcomed rain on Saturday and Monday we are getting a lot of grass growth now, so we have been turf ironing behind cutting to help gain surface speed on the greens over both courses and we are now at our full cutting program
We have repainted and replaced club logo sticker on our shoe cleaner
Another irrigation leak at tee 5 on the Balcomie course
When we get a chance we have continued working at the 13th path on the Balcomie course by adding in cross drains etc to save material washing down onto the course in heavy rain
We have been getting of turf nursery ready for seeding
This week we held a TGI event on the Craighead course
We have repainted and replaced club logo sticker on our shoe cleaner
Another irrigation leak at tee 5 on the Balcomie course
When we get a chance we have continued working at the 13th path on the Balcomie course by adding in cross drains etc to save material washing down onto the course in heavy rain
We have been getting of turf nursery ready for seeding
This week we held a TGI event on the Craighead course
Friday, 12 May 2017
With the very dry weather continuing, the irrigation system has been on most nights to water greens, surrounds and tees and hand watering through the day of any other areas and high spots, so we have been trying to keep up with repairs to the older Balcomie course system
replacing ball valves for our hose points that were leaking
mains pipe to the 4th green
Replaced all pipework/valves etc in the box at green 10
mobile sprinklers out on fairways 2 & 12
We have replaced the 1st tee bin and Pro shop bin with larger sized bins to cope with the litter on very busy days
replacing ball valves for our hose points that were leaking
mains pipe to the 4th green
Replaced all pipework/valves etc in the box at green 10
mobile sprinklers out on fairways 2 & 12
We have replaced the 1st tee bin and Pro shop bin with larger sized bins to cope with the litter on very busy days
Friday, 5 May 2017
The Craighead greens are recovering well and will be back to normal in a couple of days now, we have applied another light sand dressing to help in the recovery
We have started to spray our fairways and semi-roughs with a selective herbicide to control the daises
We hired a spray contractor to help us with all the larger fairways/semi-roughs and driving range
we have nearly completed edging/weeding and topping up our tee paths, just the 15th tee path and 13th maintenance path on the Balcomie course to complete
We have started to spray our fairways and semi-roughs with a selective herbicide to control the daises
We hired a spray contractor to help us with all the larger fairways/semi-roughs and driving range
we have nearly completed edging/weeding and topping up our tee paths, just the 15th tee path and 13th maintenance path on the Balcomie course to complete
Subscribe to: