The new toilets are coming along as scheduled on the Balcomie course
Last week saw our first real frost of the winter, which meant play was on winter greens on the Craighead course to help protect the full greens
When we do get frosts its a good time to get on with our gorse management plan over both courses, as the staff are away from the main playing surfaces so not to cause damage
Another job was to edge/weed the maintenance path at the 18th on the Balcomie course
Trench work is ongoing
We have managed to get another application of sand on the Craighead course greens, surrounds and par 3 tees to help dilute thatch and produce a firmer surface
Aeration to fairways is still ongoing when weather permits to help reduce surface compaction from the summers play and mowing
the 9th green side bunker on the Craighead course is being rebuilt to replace the worn and damaged face
Tuesday, 29 November 2016
Monday, 21 November 2016
We applied liquid iron to the Balcomie greens & surrounds to harden the plant up through the winter months
8th green side bunker on the Balcomie course rebuilt
Aeration work ongoing to all fairways over both courses
the new irrigation pipe/duct and water mains pipe installation ongoing, we are covering the pipes with sand so reduce any damage from stones etc to the pipe work
8th green side bunker on the Balcomie course rebuilt
Aeration work ongoing to all fairways over both courses
the new irrigation pipe/duct and water mains pipe installation ongoing, we are covering the pipes with sand so reduce any damage from stones etc to the pipe work
Friday, 11 November 2016
It's the start of the mid week closures on the Balcomie course for the next 2 weeks, so we have rebuild greenside bunker at 13 and made a start to digging out the 8th greenside bunker ready to be build next week
All greens & surrounds were slit tined to a depth of 6" then cut then top-dressed to help dilute thatch and produce a firmer surface
We are continuing to rebuild the 11th wall on the Craighead course
The edges round the 15th storm hut were edged and weeded to tidy up this area
13th tee path on the Craighead course was edged and weeded
The trench work across the driving range is still on going and the new irrigation pipe has been getting fusion welded together ready for being laid with the water pipe to the new toilets
All greens & surrounds were slit tined to a depth of 6" then cut then top-dressed to help dilute thatch and produce a firmer surface
We are continuing to rebuild the 11th wall on the Craighead course
The edges round the 15th storm hut were edged and weeded to tidy up this area
13th tee path on the Craighead course was edged and weeded
The trench work across the driving range is still on going and the new irrigation pipe has been getting fusion welded together ready for being laid with the water pipe to the new toilets
Thursday, 3 November 2016
That's the foundations poured for the toilets
The Green staff are digging a 350metre at 1metre deep trench to supply the new toilet with mains water and at the same time lay a new 4" irrigation mains pipe onto the Balcomie course
It's the second mid week winter closure on the Craighead course, so we have sprayed greens, surrounds, tees & fairways with soluble iron, plus we had to spray the greens with a fungicide as we had an attack of fusarium
with the course closed, we took the chance to carry out small repairs to sprinkler heads etc
We have a demo of the Rotoknife aerator to try on fairways and areas above drainage lines etc, these discs cut into the turf to a depth of 125mm helping relieve compaction and improving drainage
minimal disturbance from the discs to the playing surface
John building the new 5th bunker face
5th bunker completed
4th bunker completed
The Green staff are digging a 350metre at 1metre deep trench to supply the new toilet with mains water and at the same time lay a new 4" irrigation mains pipe onto the Balcomie course
It's the second mid week winter closure on the Craighead course, so we have sprayed greens, surrounds, tees & fairways with soluble iron, plus we had to spray the greens with a fungicide as we had an attack of fusarium
with the course closed, we took the chance to carry out small repairs to sprinkler heads etc
We have a demo of the Rotoknife aerator to try on fairways and areas above drainage lines etc, these discs cut into the turf to a depth of 125mm helping relieve compaction and improving drainage
minimal disturbance from the discs to the playing surface
John building the new 5th bunker face
5th bunker completed
4th bunker completed
Subscribe to:
Posts (Atom)