Today we took delivery of our new fairway mower and semi-rough mower. with the weather being mild for this time of year we have been out cutting the harder growing fairways and semi-roughs, cutting and cleaning the burn plus trying to finish off any painting before the start of the season
Friday, 28 February 2014
Tuesday, 25 February 2014
It's the last week of the alternate course winter closures, so we have been taking this opportunity to paint the railway sleeper bunker at hole 14, divot landing areas and re shape/move the 9th fairway/semi-rough 5 yards to the right to allow us to grow more rough down the left side which gives us more distance between holes 9 and 10 for safety, another job we completed was to verti-cut,cut and trim irrigation sprinkler heads on the tees
Friday, 21 February 2014
Monday, 17 February 2014
Thursday, 13 February 2014
This week I attended a workshop on machine maintenance etc at our local John Deere dealership, Double A
This is the last week of winter closures for the Craighead course, so our plans have been to edge/weed then top-up all the bunkers with sand
The newly built 17th greenside bunker being filled and shaped with sand
As it was dry and windy today it was a fine chance to top-dress the drainage lines on hole 4
This is the last week of winter closures for the Craighead course, so our plans have been to edge/weed then top-up all the bunkers with sand
The newly built 17th greenside bunker being filled and shaped with sand
As it was dry and windy today it was a fine chance to top-dress the drainage lines on hole 4
Friday, 7 February 2014
After solid tining and mini hollow coring we then top-dressed greens and surrounds which did take longer than planned with the adverse weather this week but all completed for the weekend
Work is nearing completion at the first tee path area on the Craighead course
All the mini cores that were taken out of the greens have been spread over the new drainage line next to green 6 to help aid recovery to the surface, work to this drainage line i.e stone picking etc will take place in the next few weeks before the start of the season
Work is nearing completion at the first tee path area on the Craighead course
All the mini cores that were taken out of the greens have been spread over the new drainage line next to green 6 to help aid recovery to the surface, work to this drainage line i.e stone picking etc will take place in the next few weeks before the start of the season
Monday, 3 February 2014
We completed work to the 5th tee path on the Balcomie course all we need to do is put ball washer back out. On the Craighead course we are starting work/repairs to 1st tee path as it has been dug up for a new sewage pipe etc for a new house next to the course. We have started to solid tine, mini-core, verti-cut and cut the Craighead greens to try and reduce the thatch levels